|
|
 |
| Auger rig attempting a 4" diameter well up to 50' deep (Franklin,MA) |
|
|
 |
| Fine sand and silt, when encountered, can't produce much water (Norfolk,MA) |
|
|
 |
| Loose sands and gravel, when encountered, can produce lots of water (Reading,MA) |
|
|
 |
| 4 inch pvc well casing installed and ready for final pump install (Hudson,MA) |
|
|
 |
| 19' shallow well pumping over 200 gallons per minute (Wilmington,MA) |
|
|
 |
| 20' shallow well pumping over 150 gallons per minute (Mansfield,MA) |
|
|
 |
| 4' diameter hand dug well (Hingham,MA) |
|
|
 |
| Digging a test pit while equipment on site (Lincoln,MA) |
|
|
 |
| Constant pressure system mounted inside shed (Wilmington,MA) |
|
|
 |
| Attempting a shallow well in winter (Wilmington,MA) |
|
|
 |
| Shallow well being developed (Mansfield,MA) |
|
|
 |
| 100 gpm well with 18" deep trench ready for completion (Wilmington,MA) |
|
|
 |
| 4" 3/4 hp 10 gpm submersible pump and motor ready for install |
|
|
 |
| Top of pvc casing cut off and submersible pump installed. Notice blow-out for winterizaiton. |
|
|
|
|
|
|